Page 6 - A Primer of Oilwell Service and Workover Completion
P. 6

.  Power tongs use a hydraulic   .  Various types of mills       .  Squeezing cement through
        Petroleum Extension-The University of Texas at Austin
                     motor.                         remove metal, cement,            perforations next to an
                 .  The crew stores tubing         sand, or scale.                upper producing zone that
                     joints on racks near the    .  Internal cutters grip and        has been depleted.    
                     mast.                          cut a hollow fish from the   .  Bradenhead squeeze   
                 .  Sucker rods hang on a rod      inside.                   .  Packer squeeze
                     hanger in the mast.       .  External cutters cut a fish   .  Corrugated liner patch   
                 .  A ram blowout preventer      from the outside.         .  Casing roller        
                 .  An annular blowout        .  A jet cutter uses a disk-shaped   .  Casing swage   
                     preventer uses a rubber seal     charge inside a hollow fish.   .  Sidetracking drills around
                     to fit any size pipe.      .  A jet cut flares the end of     a fish that cannot be
                                                      the fish.                       removed or other unrepair-
                                                 .  A chemical cutter blasts        able damage.          
                 .  Conventional electric log     acid onto the fish to cut it.    .  Horizontal drilling allows
                 .  Abrasion has damaged this   .  Bumper jar                   production from vertical
                     coupling.                 .  A hydraulic jar               reservoirs next to each
                 .  Overtightened pin and      .  A string-shot assembly        other.                
                     coupling                                                   .  To sidetrack, the crew drills
                 .  A casing scraper                                               a window in the casing.   
                 .  Swabbing works like a      .  Macaroni tubing fits inside   .  Whipstock           
                     syringe to lower pressure        the production tubing to    .  In reverse circulation, the
                     in the wellbore.               wash sand out.                 mud is pumped down the
                 .  Swabs                    .  Coiled tubing washes sand        annulus and up the
                 .  Swab cups are made of           up the annulus between pro-      tubing.               
                     or lined with natural or         duction tubing and
                     synthetic rubber.              coiled tubing.        
                 .  The lubricator and oil       .  Sand is washed up the       .  Several powerful, truck-
                     saver                          tubing when fluid is             mounted pumps are
                                                      pumped down the casing-          arranged at the well site
                                                      tubing annulus.               for a fracturing job.   
                 .   Drill pipe stuck in a       .  A washover pipe mills out   .  High fluid loss creates
                     keyseat                        packed sand around the           shorter fractures.    
                 .  A spear                       tubing.                  .  Proppants hold the fracture
                 .  An overshot              .  Chemical consolidation        open (A), but if they are
                 .  A taper tap forms screw    .  A resin-coated sand              harder than the rock, they
                     threads inside a hollow          pack                          embed in it and the fracture
                     fish.                      .  Plug-back cementing           closes (B).           
                 .  A die collar forms screw   .  Placing a plug using        .  The crew can place a packer
                     threads on the outside of        tubing                        above the area to be fractured,
                     a fish.                    .  Placing a plug using a           set packers both above and
                 .  A washpipe with a rotary        dump bailer                   below the area, or fracture
                     shoe on the bottom        .  Squeeze cementing            with no packers.      









                                                                                                             
   1   2   3   4   5   6   7   8   9   10   11