Page 20 - The Rotary Rig and Its Components
P. 20

THE ROTARY RIG AND ITS COMPONENTS



        Petroleum Extension-The University of Texas at Austin
                     layout of, 14, 15f                          roller cone bits, 47, 47f
                     overview of, 7                              rotary drilling, 1, 4, 8, 43, 49, 51
                     prime movers, 8                             rotary helpers, 20, 89f, 90, 92
                     silicon-controlled rectifiers for, 12, 14, 79  rotary hose
                   pressure. See also back pressure.                circulating system and, 51, 52f
                     in an accumulator, 69                          location of, 28f, 36, 39f
                     air compressors and, 79                        in the mud cycle, 57
                     bottomhole, 55                                 overview of, 62
                     cuttings and, 55                            rotary line. See drilling line.
                     drilling fluids, 36
                     formation, 63, 64, 72                       rotary speed, monitoring, 82
                     formation fluids, 49                        rotary table
                     kicks and, 63, 73                              arrangement of, 10f, 11f, 14, 39f, 43f
                     pump, 56                                       kelly and, 38
                     well, 40                                       operation of, 14
                   prime movers, 7, 8, 9f, 14, 15. See also engines.  overview of, 43, 50
                   production, 1                                    substructure and, 18
                   pulleys, 29. See also sheaves.                rotating system
                                                                    bits, 47–48, 47f, 48f
                   pump pressure, 56, 82
                                                                    components of, 33–35
                                                                    drill collar, 46–47, 46f
                   quebracho, 54
                                                                    drill pipe, 45, 45f
                                                                    drill stem, 35, 44, 44f
                   ram preventers, 65f, 67–68, 67f, 68f             hole diameter, 49–50, 50f
                   Range 1 drill pipe, 45                           kelly and, 38–42, 39f
                   Range 2 drill pipe, 45                           overview of, 33–35, 50
                   Range 3 drill pipe, 38, 45                       rotary table, 39f, 43, 43f
                   rectifiers, silicon-controlled, 12, 14, 79       swivel, 35–36
                   reel, supply, 29, 30f, 31                        tool joints, 46, 46f
                   reeving, 26, 26f, 29–31                          top drive, 36, 37f
                   remote control panels. See control panels.    roughneck, 89, 92
                   remote power-adjustable choke, 71             roustabouts, 90, 92
                   reserve pits, 52f, 80
                   rig. See also electric rig; mechanical rig.   safety. See also blowout preventer (BOP).
                     crewmembers on, 85                             blowouts and, 63
                     layout of, 15f                                 using cathead spools, 23
                     portability of, 1, 2                           with hazardous dry materials, 55–56
                     power system of, 7–8                           kelly cock wrench, 41
                     purpose of, 1, 3f                              making up or breaking out a pipe, 22, 36
                     seen as a whole, 77                            noise abatement, 12
                     different types of, 4, 7, 9, 11             sand trap, 52f, 80
                   rig-down, 19                                  saver sub. See kelly saver sub.
                   rig floor, 18                                 SCRs. See silicon-controlled rectifiers (SCRs).
                   rig superintendent. See toolpushers.          settling pit/tank, 80
                   rig-up, 7, 12, 19                             shaker tank, 52f, 74, 80
                   rock bits. See roller cone bits.              shale, bits for, 48


                   140
   15   16   17   18   19   20   21   22   23   24