Deprecated: Joomla\Input\Input implements the Serializable interface, which is deprecated. Implement __serialize() and __unserialize() instead (or in addition, if support for old PHP versions is necessary) in /home/utweb/utw10286/public_html/libraries/vendor/joomla/input/src/Input.php on line 41

Deprecated: Return type of Joomla\Input\Input::count() should either be compatible with Countable::count(): int, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/utweb/utw10286/public_html/libraries/vendor/joomla/input/src/Input.php on line 170

Deprecated: Joomla\CMS\Input\Input implements the Serializable interface, which is deprecated. Implement __serialize() and __unserialize() instead (or in addition, if support for old PHP versions is necessary) in /home/utweb/utw10286/public_html/libraries/src/Input/Input.php on line 31

Deprecated: Joomla\CMS\Input\Cookie implements the Serializable interface, which is deprecated. Implement __serialize() and __unserialize() instead (or in addition, if support for old PHP versions is necessary) in /home/utweb/utw10286/public_html/libraries/src/Input/Cookie.php on line 0

Deprecated: str_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home/utweb/utw10286/public_html/libraries/src/Uri/Uri.php on line 141
Well Completion

Well Completion

After a well is drilled, there is still much that needs to be done before oil and gas can begin to flow to the surface.

Module content:

  • Basic steps of well completion
  • Considerations in well completion design
  • Common types of equipment and mechanisms used including:
    • Tubular goods
    • Packers sleeves
    • Production liners
    • Wellhead and trees
    • Subsurface safety valves
  • Common types of lower well completions:
    • Open hole
    • Cased and perforated
    • Open hole with liner
  • Perforating options
  • Considerations for lower completions at the sandface
  • Special completions:
    • Horizontal wells with multistage hydraulic fracturing
    • Wells with extended reach drilling
    • Intelligent completions
    • Multiple completions

In order to successfully complete this module you will be required to:

  • Go through all the lessons in the module.
  • Complete the practice items.
  • Complete the module quiz with a passing grade of 70%. You will have 2 chances to complete the quiz.

At the end, you will receive a Certificate of Completion. It should take you approximately 45-60 minutes to complete this module.

For multiple licenses or to use the material in training, please contact us at 800.687.4132 or 512.471.5940 or by sending an email to info@petex.utexas.edu.

Catalog #LicensePrice 
93.M0110 6 Months $65.00